B. But sometimes those means and methods are subject to advance scrutiny by the design professional, through the “shop drawing” submittal process. Information related to bridge shop drawings. The architects want a drawing that is visually similar to theirs including filed dimensions, relation of your work to work by others, sink cutouts, appliance or equipment openings and - most important - your manufacturing methods for achieving the design. Step Three: Submittal Preparation: The general contractor will either prepare the submittal or delegate it to the relevant subcontractor. Submittals are those shop drawings, product data, samples, and mock-ups to be delivered to the design professional (the architect or engineer) for review and action as required by the contract documents. The drawing includes details, dimensions, and the configuration of the item being fabricated. Submit Shop Drawings. The installation was consistent with the shop drawings, but inconsistent with the contract documents. Document Submittals, Material Submittals, Shop Drawing Submittals, Submittals One of the tasks of a Structural Engineer whether you assigned as a Site or Design Engineer includes the review of the contractor’s documents and shop drawings submittals. Attach the submittal file, including the optional design when applicable, to an email whose subject line matches the file name of the submittal PDF. What I did not see as part of the submittal … Shop drawings may be tracked by date received, by chronological order, or by a designated tracking number. From contributor A: Submittal drawings are shop drawings; they should be drawn the way you intend to build the items. Ideally, a shop drawing submittal should leave nothing open for guessing or to interpretation. The Importance of the Construction Submittal Process. Develop a Simple Shop Drawing and Submittal System That Works Get masonry industry news in your inbox Subscribe to Masonry Messenger to receive the masonry resources and information you need to stay current. Tracking shop drawings by date is a perfectly acceptable tracking method which requires little effort, however, this method should be used only when the total number of submittals and re-submittals is expected to be very small. Not necessarily. This notice shall be set forth in a written communication separate from the Shop Drawings or Sample submittal; and, in addition, in the case of Shop Drawings by as specific notation made on each Shop Drawing submitted to Engineer for review and approval of each such variation. All Shop Drawing submittals shall be accompanied by the CONTRACTOR’s standard submittal transmittal form. A lot of our clients get confused with shop drawings vs construction drawings at times. This notice shall be both a written communication separate from the Shop Drawing’s or Sample Submittal; and, in addition, by a specific notation made on each Shop Drawing … At least, those of you Architects, Engineers and Designers who are responsible for reviewing shop drawings or submittal drawing sets. The “means and methods” for doing so are typically up to the contractor. Approval does …